Project | Construction Period |
---|---|
Replacement of Three Air-cooled Chillers with Associated Accessories for SARS Ward at Tuen Mun Hospital (Contract No. 1537EM19W) | 2019 – 2021 |
Replacement of Chillers and Associated Equipment at Tuen Mun Hospital and Castle Peak Hospital (Contract No. 1733EM19W) | 2019 – 2021 |
Improvement Works on Chiller Plants at China Ferry Terminal, Hydro Building and Macau Ferry Terminal (Contract No. 1456EM17W) | 2018 – 2020 |
Replacement of Air Conditioning System and Central Control Monitoring System at Tsuen Wan Government Office (Contract No. 2792EM17W) | 2018 – 2020 |
High Efficiency Chiller and Chilled Water Pump Retrofitting Works for Public Health Laboratory Centre (Contract No. 1622EM17W) | 2017 – 2018 |
Replacement of Air-Cooled Chillers and Associated Accessories at Luen Wo Hui Municipal Services Building (Contract No. 1816EM16W) | 2016 – 2017 |
Supply and Replacement of Air-Conditioning System at Hong Kong Police Headquarters Arsenal House West Wing (Contract No. 1040EM12W) | 2014 – 2015 |
Building Services for Joint-User Complex In Area 44, Fanling, N.T. | 2012 – 2014 |
Replacement of Central Air-Conditioning System and Associated Accessories at The Prince Philip Dental Hospital (Contract No.1022EM10M) | 2011 – 2013 |
Project | Scope of Work | Client / Consulting Engineer | Construction Period |
---|---|---|---|
Proposed Residential Development No.21 Wang Yip Street West, Yuen Long | Electrical Installation | Allied Success Construction Limited | 2021 – 2023 |
Hotel Building on NKIL 1896RP, 1895RP & 1408RP at Nos. 189, 191 & 193 Pei Ho Street | MVAC Installation | Chan Shum Kee Sam Lee Construction Co Ltd | 2016 – 2017 |
China Unicom (HK) Global Centre Tseung Kwan O, Kowloon | MVAC Fitting Out | Zhong Shan Engineering Consulting Ltd | 2015 – 2016 |
Takan Lodge 199 Johnston Road, Wanchai, Hong Kong | Alteration & Additions Works of MVAC, Electrical and Fire Services Installation | Hanison Interior & Renovation Ltd | 2015 – 2017 |
Tai Yau Plaza 181 Johnston Road, Wanchai, Hong Kong | Electrical Improvement Work | Wan Chung Construction Co Ltd | 2012 – 2013 |
City University Kowloon Tong, Kowloon | Improvement Works of Energy Efficiency | City University of hong Hkong | 2008 – 2009 |
Tak House No. 5-11 Stanley Street, Central, Hong Kong | Building Services Installation | Ranking & Hill (HK) Ltd | 2007 – 2010 |
Citybus Headquarters Citybus Headquarters and Bus Maintenance Depot at Chaiwan | MVAC and Fire Services Installation | Thomas Anderson & Partners | 2002 – 2004 |
Banyan Garden No. 861-871 Lai Chi Kok Road, Kowloon | MVAC Installation | Associated Consulting Engineers | 2001 – 2002 |
CCCC, our parent company, has been listed on the main board of the Hong Kong Stock Exchange since December 15, 2006 (stock code: 1800.HK). It becomes the first large-scale state-owned infrastructure enterprise wholly listed outside China.
It is the world's leading comprehensive service provider for large-scale infrastructure. It is mainly engaging in the investment, construction and operation of transportation infrastructure, equipment manufacturing, real estate, and comprehensive urban development. It provides customers with a package of investment financing, consulting, and planning, design and construction, management and operation, solutions and integrated services.
QUAD-TECH ENGINEERING (HONG KONG) COMPANY LIMITED was first established in 1984 and was successfully taken over by China Communications Construction Company Limited (“CCCC”) in 2020. Since then, the company has been developed and operated comprehensively. During the four decades, it has grown and become one of the reputable building services contractors.
Copyright ©高得工程有限公司